Li-ion & DC Motor Programming Instructions
Shared Li-ion and DC motor instructions for pairing, operating limits, and supported programming functions.
Download product and programming guides, review motor-family references, and watch official instructional videos for compatible Uprise shade and drapery systems.
Check the motor’s label and supplied control before changing settings. Confirm the product reference, power type, and installation configuration. Keep the applicable manual with the project’s handover documents.
Shared Li-ion and DC motor instructions for pairing, operating limits, and supported programming functions.
Zero Li-ion Q1.1 motor technical reference. Confirm the exact motor supplied.
DC Cord Lift CL0.6/CL0.8 programming guide for compatible drive systems.
CL0.6 low-voltage cord-lift motor product specifications.
Versa drapery motor and power-module reference.
Versa drapery motor setup and programming instructions.
ARC Drapery Motor programming manual supplied for the C1.2 support reference.
Fabric-tension line-voltage motor programming manual. Use the relevant US installation section.
Rechargeable Li-ion FT exterior motor technical reference.
Dedicated rechargeable Li-ion FT motor programming instructions.
Official Automate supplier documents. Use the guide for the supplied motor model and configuration.
Use the applicable rechargeable Li-ion or DC motor instructions. Confirm the power supply, tube hardware, and operating limits for the actual shade.
Review the CL motor reference and low-voltage wiring requirements. The guide describes a drive system; confirm the complete Uprise Roman configuration.
Versa and C1.2 are different motor families. Match power, track arrangement, and limit-setting instructions to the supplied equipment.
FT line-voltage and Li-ion FT battery motors need the correct guide. Review the lock and tension configuration with the installer before programming.
Motor programming and bridge integration are separate setup tasks. Establish the shade’s operating limits, then pair and test the approved integration.
Bond Bridge Pro resourcesOfficial Automate instructions for common setup tasks. Apply the steps only to the motor and controller shown or identified in the applicable guide.
A complete ARC motor setup walkthrough, from pairing through setting travel limits.
Wake an ARC motor and pair it with a compatible remote before programming.
Set the upper and lower stopping positions during initial ARC shade setup.
Change previously programmed upper and lower travel limits.
Use the Push PRO leveling function to align multiple shades.
Check an Automate motor’s battery status using the remote battery-check function.
Match the motor reference and control system to the guide before programming. Some manuals apply across multiple motor families; others are specific to a product.
Yes. The embedded official videos cover pairing, limits, adjustments, and selected controller functions. Check the video’s applicability to the supplied motor and remote.
Visit the Uprise Bond Bridge Pro resource page for setup guidance, downloadable technical references, and integration videos.
Send Uprise the order reference and motor label. Our team can help identify the relevant installation and programming information.
Send the motor label, product family, and order reference to Uprise.